An industrial project delivered by N.Sani Construction in 9500 ch. de la Côte de Liesse, Lachine H8T 1A2. Spanning 85,000 ft² of purpose-built space. Completed over a 14 Months build schedule. Finished in 2022. Built to the highest standards of quality, safety, and craftsmanship that have defined N.Sani since 1957.
Get Estimate
Every detail of this industrial project was carefully considered — from structural integrity to the finishing touches that set it apart.
Spanning a footprint designed for maximum functionality, this build delivers on both performance and efficiency without compromise.
Completed in 2022. From first stake to final inspection, our team kept this project moving — on schedule and on budget.