industrial

Rolls Royce – Renovation Usine

An industrial project delivered by N.Sani Construction in 9500 ch. de la Côte de Liesse, Lachine H8T 1A2. Spanning 85,000 ft² of purpose-built space. Completed over a 14 Months build schedule. Finished in 2022. Built to the highest standards of quality, safety, and craftsmanship that have defined N.Sani since 1957.

Get Estimate
Rolls Royce – Renovation Usine
The project

From concept to completion

Built to last, designed to impress

Every detail of this industrial project was carefully considered — from structural integrity to the finishing touches that set it apart.

85,000 ft² of purpose-built space

Spanning a footprint designed for maximum functionality, this build delivers on both performance and efficiency without compromise.

Delivered in 14 Months

Completed in 2022. From first stake to final inspection, our team kept this project moving — on schedule and on budget.

Street View
PreviousFedEx Nepean
All Projects
NextMakeGoodFood